EasyManuals Logo

Tektronix GeoProbe G10 Installation Guide

Tektronix GeoProbe G10
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
G10 Installation Guide 7.13.2 14
1
G10 New Installation and Upgrade Workflows
Rev. 005-140228
- DO NOT remove the 1G cabling (if two-array configuration) or the
TRM100 RTM.
Figure 1.4 - Reconnect Cabling to SRM200 RTM
4. Insert the IIC200 and tighten thumbscrews.
5. Reconnect the 10G fiber (that you removed from the TRM100 RTM or SRM100
R
T
M). Refer to Monitored Link Cabling (IIC200) for details.
6. Continue with Configure Probe Setup. Refer to Chapter 3 if necessary for
troubleshooting Ethernet and
SAS Cabling issues.
Tektronix Communications | For Licensed Users | Unauthorized Duplication and Distribution Prohibited

Table of Contents

Other manuals for Tektronix GeoProbe G10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tektronix GeoProbe G10 and is the answer not in the manual?

Tektronix GeoProbe G10 Specifications

General IconGeneral
BrandTektronix
ModelGeoProbe G10
CategoryAccessories
LanguageEnglish