EasyManuals Logo

Tektronix GeoProbe G10 Installation Guide

Tektronix GeoProbe G10
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #94 background imageLoading...
Page #94 background image
G10 Installation Guide 7.13.2 94
A
Rev. 005-140228
Figure A.2 shows a rack installation for expanded storage:
SA200R controller enclosures support up to seven expansion enclosures. Due to the
increased performance of the SA200R, only one controller enclosure is required
for a deployment using this model.
SA100R controller enclosures support up to three expansion enclosures.
A single fuse panel supports five components (G10s and storage enclosures). Fuse
panels only apply to DC power configurations.
For IAP100 configurations, make sure to leave 1U of space below the G10 to
allow for SAS cabling from the SAS AMC on the front of the G10 to the back of
the controller enclosure.
Tektronix Communications | For Licensed Users | Unauthorized Duplication and Distribution Prohibited

Table of Contents

Other manuals for Tektronix GeoProbe G10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tektronix GeoProbe G10 and is the answer not in the manual?

Tektronix GeoProbe G10 Specifications

General IconGeneral
BrandTektronix
ModelGeoProbe G10
CategoryAccessories
LanguageEnglish