EasyManua.ls Logo

Toro Reelmaster 3100-D - Reel Drive Solenoid Testing

Toro Reelmaster 3100-D
385 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ReelDriveSolenoid
g346523
Figure140
1.Hydraulicmanifold2.Solenoid
ThehydraulicsystemontheReelmasterusesasolenoidvalvecoilonthe
hydraulicmanifold(Figure140).Whenthesolenoidvalvecoil(SV)isenergized,
hydraulicowisdirectedtothecuttingdecks.
Thestandardcontrolmoduleprovidescurrenttothesolenoidvalvecoilbased
onthepositionofseveralinputs.ALEDonthestandardcontrolmodulewillbe
illuminatedwhenthesolenoidvalvecoilisenergized.
Testing
Note:Thesolenoiddoesnothavetoberemovedfromthecartridgevalvefor
testing.
1.MakesurekeyswitchisintheOFFposition.Unplugwireharnesselectrical
connectorfromsolenoidvalvecoil.
Note:Priortotakingsmallresistancereadingswithadigitalmultimeter,
shortthetestleadstogether.Themeterwilldisplayasmallresistancevalue
(usually0.5ohmsorless).Thisresistanceisduetotheinternalresistance
ofthemeterandtestleads.Subtractthisvaluefromthemeasuredvalue
ofthecomponentyouaretesting.
2.Apply12VDCsourcedirectlytothesolenoid.Listenforsolenoidtoswitchon.
3.Remove12VDCsourcefromthesolenoid.Listenforsolenoidtoswitchoff.
4.Measureresistancebetweenthetwoconnectorterminals.Theresistance
shouldbeabout7.2ohms.
5.Installnewsolenoidifnecessary.
A.MakesureO-ringisinstalledateachendofcoil.Apply”Loctite242”or
equivalenttothreadsonendofvalvestembeforeinstallingnut.
B.Tightennuttoatorqueof34N·m(25ft-lb).Over-tighteningmaydamage
thesolenoidorcausethevalvetomalfunction.
6.Reconnectelectricalconnectortothesolenoid.
ElectricalSystem:ComponentTesting
Page6–40
Reelmaster
®
3100-D/3105-D
20252SLRevA

Table of Contents

Other manuals for Toro Reelmaster 3100-D

Related product manuals