EasyManua.ls Logo

Treif PUMA-CE /E Series - Electrical Installation

Treif PUMA-CE /E Series
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.3. Electrical installation
The machine has to be installed and secured by a chartered electrician
in compliance with the regulations applicable at the location of erection.
Please note the electric circuit diagram in the catalogue of spare parts
in the manual !
Please refer to the identification plate for the power of the back-up
fuse to be provided by the customer.
Check whether the operating voltage mentioned on the identification
plate corresponds to the voltage of your mains supply.
The permissible deviation is 5 % maximum.
It is imperative that the correct phase sequence of the supply voltage
is observed, when the machine is installed !
The machine has been set for “DOCKWISE PHASE SEQUENCE” in the
works of the producer.
If the three-phase socket has an anti-clockwise phase sequence, a
chartered electrician has to change two of the three phases of this
socket.
The installation of the machine has to be effected by means of a
plug-and-socket connection or by means of a lockable mains switch.
Transport and erection
Page 20 02/2005 123842-GB

Table of Contents

Related product manuals