OM EZ38 us 1.1 * ez38t600.fm 6-5
6
1. Fit an empty bucket and lock it safely.
2. Remove all dirt from the machine.
3. Park the machine on firm, level and horizontal ground.
4. Curl bucket.
5. Fully raise the boom.
6. Pull the stick toward the machine.
7. Raise the stabilizer blade.
8. Position the boom straight ahead at the center of the machine.
9. Stop the engine.
10.Operate the control lever repeatedly to release the pressure in the
hydraulic system.
11.Raise the control lever base.
12.Remove the starting key and carry it with you.
13.Safely store all loose objects inside the machine.
14.Leave the cabin, close and lock all doors, windows and covers.
15.Install suitable slings at the points provided for lifting the machine.
16.Slowly raise the machine until there is no more contact with the
ground.
17.Wait until the machine does not swing any more.
18.If the balance and the condition and position of the slings is correct,
slowly raise the machine to the required height and load it.
Required lengths L1 and L2 of the lifting gear:
Information
The manufacturer’s warranty shall not apply to accidents or damage
caused by loading or transporting the machine.
Fig. 214
L1
L2
Length Dimension
L1 1910 mm (75 in)
L2 3150 mm (10'-4'')
Authorized loads Force
Boom lifting eye 40 kN (8992 lbs)
Stabilizer blade lifting eye 40 kN (8992 lbs)