OM EZ38 us 1.1 * ez38i400.fm 4-29
4
Job site
Height of job site A: 120 cm (47 in).
Figures 97 and 98 refer to work with a Wacker Neuson hydraulic hammer.
Working with another attachment can modify the height of the job site.
Installing
1. A minimum 2 persons are required for installing/removing.
2. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
3. Install/remove shatter protection A from the front and fasten/remove it
at the fastening points B with the fastening material supplied.
4. Tighten screws C at fastening points B to 25 Nm (18 ft.lbs).