EasyManua.ls Logo

Waters 2475 - Before you begin

Waters 2475
228 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-2 Setting Up the Detector
Before you begin
To install the detector, you must know how to set up and operate laboratory
instruments and computer-controlled devices and how to handle solvents.
Before installing the detector, ensure that
it is not situated under a heating or cooling vent.
the required components are present.
none of the shipping containers or unpacked items are damaged.
If you discover any damage or discrepancy when you inspect the contents of
the cartons, immediately contact the shipping agent and your local Waters
representative.
Customers in the USA and Canada should report damage and discrepancies to
Waters Technical Service (800 252-4752). Others should phone their local
Waters subsidiary or Waters corporate headquarters in Milford,
Massachusetts (USA), or they may visit http://www.waters.com, and click
Offices.
For complete information on reporting shipping damages and submitting
claims, see the document Waters Licenses, Warranties, and Support Services.
Environmental specifications
Attribute Specification
Operating temperature 4 to 40 °C (39.2 to 104 °F)
Operating humidity 20 to 80%, noncondensing
Shipping and storage temperature 20 to 80 °C (4 to 176 °F)
Shipping and storage humidity 0 to 90%, noncondensing

Table of Contents

Related product manuals