EasyManua.ls Logo

Yamaha FZ09E - Installing the Swingarm

Yamaha FZ09E
468 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Collars "3"
Damage/scratches
->
Re
place.
Bearings "4"
Damage/pitting 4 Replace.
4 2
2 3
\
~
\b
()
''""'""
INSTALLING THE SWINGARM
1. Lubricate:
Dust covers
Pivot shaft
O
il
seals
Collars
2.
Install:
Recommended lubricant
Lithium
-soap-based grease
Bear
in
gs "1"
(to t
he
sw
in
garm)
O
il
sea
ls "
2'
1
l@t@i
(to t
he
sw
in
garm)
Installed depth "a"
2.0
mm
(0.08
in
)
Installed depth "b"
9.0
mm
(0.35
in
)
Installed depth "c"
0.5-1.5
mm
(0.02-0.06 in)
Installed depth "d"
7.0
mm
(0.28
in
)
Installed depth "e"
1.
5-2
.5
mm
(0
.06-0
.1 O in)
TIP
~~~~~~~~~~~~~~
When insta
lli
ng t
he
oil seals to the swingarm,
face the character stamp
of
the o
il
seals ou
ts
i
de
.
SWINGARM
e-.....=- - e
fl
A. Left side
B. Right side
3. Insta
ll
:
Swingarm
Pivot shaft
Pivot
shaft
nut
11
O Nm
(11
m-kgf,
80
ft
-I bf)
4. Insta
ll
:
Drive chain
Re
fer to "INSTALLING THE DRIVE CHAIN"
on page 4-73.
Connecting a
rm
lower bolt
Connecting a
rm
lower nut
Connecting
arm
lower
nut
55
Nm
(5.5 m-kgf,
40
ft-lbf)
Rea
r wheel
Re
fer to "REAR
SH
OCK ABSORBER AS-
SEMBLY'' on page
4-
63
and "REAR WHEEL"
on page 4-
14
.
5. Ad
ju
st:
Drive chain slack
Re
fer to "ADJUSTING THE DRIVE CH
AI
N
SLACK" on page 3-16.
Drive chain
slack
5.
0-
15.0
mm
(0.20--0.59
in
)
4-69

Table of Contents

Related product manuals