EasyManua.ls Logo

YASKAWA SGD7S

YASKAWA SGD7S
621 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.1 Flow of Trial Operation
7.1.2 Flow of Trial Operation for Linear Servomotors
7-4
7.1.2
Flow of Trial Operation for Linear Servomotors
The procedure for trial operation is given below.
Preparations for Trial Operation
Step
Meaning Reference
1
Installation
Install the Servomotor and SERVOPACK
according to the installation conditions. First,
operation is checked with no load. Do not
connect the Servomotor to the machine.
Chapter 3 SERVOPACK Installation
2
Wiring and Connections
Wire and connect the SERVOPACK. First,
Servomotor operation is checked without a
load. Do not connect the CN1 connector on
the SERVOPACK.
Chapter 4 Wiring and Connecting SERVOPACKs
3
Confirmations before Trial Operation
7.2 Inspections and Confirmations before Trial Opera-
tion on page 7-6
4
Power ON
5
Setting Parameters in the SERVOPACK
6
Setting the Origin of the Absolute Linear
Encoder
Note: This step is necessary only for an Absolute
Linear Servomotor from Mitutoyo Corpora-
tion.
5.18.1 Setting the Origin of the Absolute Linear
Encoder on page 5-55
Step
No. of Parameter to
Set
Description Remarks Reference
5-1 Pn282
Linear Encoder
Scale Pitch
Set this parameter only if
you are using a Serial Con-
verter Unit.
page 5-19
5-2
Writing Parameters
to the Linear Servo-
motor
Set this parameter only if
you are not using a Serial
Converter Unit.
page 5-20
5-3 Pn080 = n.X
Motor Phase
Sequence Selec-
tion
page 5-25
5-4 Pn080 = n.X
Polarity Sensor
Selection
page 5-27
5-5 Polarity Detection
This step is necessary only
for a Linear Servomotor with
a Polarity Sensor.
page 5-28
5-6
Pn50A = n.X
and Pn50B =
n.X
Overtravel Signal
Allocations
page 5-32
5-7 Pn483, Pn484 Force Control
page 6-62

Table of Contents

Related product manuals