EasyManua.ls Logo

YOKOGAWA ADMAG AXR - 2. HANDLING PRECAUTIONS; 2.1 Checking Model and Specifications; 2.3 Storage Precautions

YOKOGAWA ADMAG AXR
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
<2. HANDLING PRECAUTIONS>
2-1
IM 01E30D01-01EN
2. HANDLING PRECAUTIONS
This instrument has been inspected carefully at
the factory before shipment. When the instrument
is delivered, visually check that no damage has
occurred during transportation.
Read this section carefully as it contains important
information on handling this instrument. Read the
relevant sections for information not contained in
this section. If you have any problems or questions,
pleasecontactYokogawasalesofce.
2.1 Checking Model and
Specications
Themodelcodeandspecicationsarefoundon
the name plate located on the outside of the case.
Checkthatthemodelcodeandspecications
match what you have ordered.
Be sure you have your model number and serial
number available when contacting Yokogawa.
F0201.ai
Figure 2.1.1 Name Plate (Integral Flowmeter Type)
2.2 Accessories
Check that the parts shown below are included in
the package:
• Centeringdevice(wafertypeonly):1pc.
• Plug:1pc.
2.3 Storage Precautions
If the instrument is to be stored for a long period of
time after delivery, observe the following points.
The instrument should be stored in its original
packing condition in the storage location.
Selectastoragelocationthatfullsthefollowing
conditions:
• Aplacewhereitwillnotbeexposedtorainor
water
• Aplacesubjecttominimalvibrationsor
shocks
• Temperatureandhumiditylevelsshouldbe
as follows:
Temperature: -30 to 70°C
Humidity: 5 to 80% RH (no condensation)
The preferred ambient temperature
and humidity levels are 25°C and
approximately 65% RH.
IftheAXRmagneticowmeteristransferred
to the installation site and stored without being
installed, its performance may be impaired
duetotheinltrationofrainwaterandsoforth.
BesuretoinstallandwiretheAXRmagnetic
owmeterassoonaspossibleaftertransferring
it to the installation location.

Table of Contents

Related product manuals