<4.  WIRING>
4-1
IM 01E30D01-01EN
4. WIRING
This section describes the wiring of the integral 
owmeter.
WARNING
 
Thewiringofthemagneticowmetermust
be performed by expert engineer or skilled 
personnel. No operator shall be permitted to 
perform procedures relating to wiring.
CAUTION
Once all wiring is complete, check the 
connections before applying power to the 
instrument. Improper arrangements or wiring 
may cause a unit malfunction or damage.
4.1  Wiring Precautions
Be sure to observe the following precautions when 
wiring:
CAUTION
• Donotconnectcablesoutdoorsinwet
weather in order to prevent damage from 
condensation and to protect the insulation, 
e.g.insidetheterminalboxoftheowmeter.
• Allthecableendsmustbeprovidedwith
round crimp-on terminals and be securely 
wired.
• Thecablemustberoutedinsteelconduit
tube16(JISC8305)orexibleconduit
tubes 15 (JIS C 8309). Keep the conduits or 
exibletubeswatertightusingsealingtape.
• Whenwaterproofglandsorunionequipped
waterproof glands are used, avoid tightening 
the glands with an excessive torque.
• Aplugisprovided.Usethisplugtocover
the unused wiring port when wiring the 
instrument with only one. 
• Besuretoturnthepoweroffbeforeopening
the terminal box cover. 
• Beforeturningthepoweron,tightenthe
terminal box cover securely.
• Theterminalboxcoverislockedbythe
special screw. In case of opening the 
terminal box cover, use the hexagonal 
wrench (nominal size 3). For handling the 
locking screw, read Section 4.5.
• Besuretolockthecoverbythespecial
screw using the hexagonal wrench (nominal 
size 3) after installing the cover. For handling 
the locking screw, read Section 4.5.
• Explosionprooftypesmustbewiredin
accordancewithspecicrequirement(and,
in certain countries, legal regulations) in 
order to preserve the effectiveness of their 
explosion proof features.