Maintenance 01/2011 Page 443
• Connect the mains cable. • Connect one end of the mains cable to the main cabinet and the
other end to a grounded mains power point.
Attention : The iPBX must be powered off when installing
the mains cable.
Never connect network lines while the mains
power cable is unplugged.
• Power on the iPBX. • Before powering on the cabinet, check that all the following tasks
have been performed:
- all line connections are installed,
- all equipment has been connected to a grounded power point.
• Power on the iPBX:
- or an iPBX with several cabinets, first power on the expansion
cabinet by setting the
“I/O” switch on the power supply module set to “I”.
- Set the “I/O” switch on the main cabinet power supply module to
position “I”.
• Check the status of the indicators (see Sections 4.6).
• Check the UCV card's
system and application
software releases using
the AMP.
Refer to the document Aastra Management Portal AXD-AXL-AXS-
AXS12-A5000 Server – Operating Manual.
• Restore the data of the
old configuration.
• Refer to the document Aastra Management Portal AXD-AXL-
AXS-AXS12-A5000 Server – Operating Manual.
Table 20:
OPERATION DETAILS OF THE OPERATION / COMMENTS