EasyManua.ls Logo

ABB ACS580-04 - Electrical Installation; Installing the Module; Mechanical Installation; Necessary Tools

ABB ACS580-04
298 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mechanical installation
Necessary tools
Screwdriver and a set of suitable bits.
Unpacking and examining the delivery
1. Open the option package. Make sure that the package contains:
the option module
a mounting screw.
2. Make sure that there are no signs of damage.
Installing the module
See section Installing option modules (page 110).
Electrical installation
WARNING!
Obey the safety instructions of the drive. If you ignore them, injury or
death, or damage to the equipment can occur.
Stop the drive and do the steps in section Electrical safety precautions (page 21)
before you start the work.
Necessary tools
Screwdriver and a set of suitable bits.
Wiring
Connect the external cables to the applicable module terminals. Ground the outer
shield of the cables to the SHIELD terminal.
CAIO-01
± 11 V, ± 22 mA
AI-3
AI-4
AI-5
AO-3
AO-4
0-11 V, 0-22 mA
80
SHIELD
AI +VE
81
AI -VE
82
83
SHIELD
AI +VE
84
AI -VE
85
86
SHIELD
AI +VE
87
AI -VE
88
SHIELD
90
AO +
91
GND
92
SHIELD
93
AO +
94
GND 95
CAIO-01 bipolar analog I/O adapter module 251

Table of Contents

Other manuals for ABB ACS580-04

Related product manuals