Quick installation, commissioning and operating flowchart
SeeTask
Guidelines for planning the mechanical installa-
tion (page 51)
Plan the mechanical and electrical installation and
acquire the accessories needed (cables, fuses, etc.).
Guidelines for planning the electrical installa-
tion (page 73)
Examine the ambient conditions, ratings, required
cooling air flow, input power connection, compatib-
ility of the motor, motor connection, and other
technical data.
Technical data (page 177)
Option manual (if optional equipment is included)
Moving and unpacking the unit (page 61)
Unpack and examine the units.
Examining the delivery (page 66)
Make sure that all necessary optional modules and
equipment are present and correct.
If the drive has not been powered (either in storage
or unused) for a year or more, the converter DC link
capacitors must be reformed. Reforming the capa-
citors (page 176))
Only intact units can be started up.
Examining the installation site (page 61)
Examine the installation site. Attach the base of the
cabinet to the floor.
Routing the cables (page 88)
Route the cables.
Measuring the insulation resistance of the input
power cable (page 102)
Measure the insulation of the input cable, the motor
and the motor cable and brake assembly (if present).
Measuring the insulation resistance of the motor
and motor cable (page 102)
Measuring the insulation resistance of the brake
resistor circuit (page 102)
Mechanical installation (page 61)
Install the additional components into the cabin-
et: eg, main disconnector, main contactor, main
AC fuses, etc.
Install the drive module into the cabinet.
Connect the motor cables to the drive module
terminals.
Connect the DC connection cables (if any) to the
drive module terminals.
Option +D150: Connect the brake resistor cables.
If the main disconnector is installed into the
cabinet, connect it to the drive module terminals
and the input power cabling to the disconnector.
Electrical installation (page 101)
Resistor braking (page 241)
Drive module with option +B051: Installation ex-
ample of drive module with IP20 shrouds (option
+B051) (page 113)
Drive module with option +H381: Installation ex-
ample with full cabling panels (option
+H381) (page 121)
Manuals for any optional equipment
External control unit (option +P906) (page 147)
Option +P906: Connect the external control cables
to the drive control unit and the control unit to the
drive.
Installation checklist (page 159)
Check the installation.
Start-up (page 161)
Commission the drive.
Refer to ACS580 standard control program firmware
manual (3AXD50000016097 [English]).
Operate the drive: start, stop, speed control etc.