EasyManua.ls Logo

Agilent Technologies 1200 Infinity Series - Preparing the Detector

Agilent Technologies 1200 Infinity Series
276 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
50 Agilent 1200 Infinity Series DAD User Manual
4 Using the Module
Preparing the Detector
Preparing the Detector
For best performance of the detector
Let the lamp warm-up and stabilize for at least one hour (initial turn on of
the module requires a longer time depending on the environment and the
application needs); refer to “Specification Conditions” on page 28.
For high sensitivity measurements, a stable environment is required; refer
to “Environment” on page 22. Prevent drafts from air condition systems.
Setting an appropriate reference wavelength could improve the baseline
behavior. Alternatively use the 1.6 μL heat exchanger from the G1316C
TCC.
Do not work with removed front panels. When the front panel of the
G1316C TCC (typically located below the detector) is removed while the
TCC is set to high temperatures, the up-streaming air could influence the
stability of the detector baseline.

Table of Contents

Other manuals for Agilent Technologies 1200 Infinity Series

Related product manuals