EasyManua.ls Logo

BT REFLEX RR B2-3CC - 34.3.3 Assembling the rod seal and the support ring; 34.3.4 Dismantling the ram; 34.3.5 Assembling the ram; 34.3.6 Assembling the cylinder

BT REFLEX RR B2-3CC
514 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Valid from serial number T-code
713962- 409-414, 669-671
Order number Date
218920-040 2005-06-01
© BT Europe AB Service Manual REFLEX RR B/E, RR B/E CC 34- 3
Tilt cylinder – 6660.2
Dismantling and assembling the cylinder
34.3.3 Assembling the rod seal and the
support ring
Check that the ram is not damaged.
NOTE!
If the piston is scratched or in any other way damaged it should be re-
placed to avoid leakage after assembly.
Position the support ring on the ram.
Position the rod seal on the ram.
34.3.4 Dismantling the ram
Remove the rod seal and the support ring.
Knock and heat the ram a little, if necessary.
Unscrew the ram using a pipe wrench.
Brush off any old flange sealant.
34.3.5 Assembling the ram
•Apply OMNI 230 on the threads.
Screw in the ram using a hook spanner.
Take care to wipe off all surplus sealant.
34.3.6 Assembling the cylinder
Insert the rod in the cylinder tube.
Fit the top sleeve on the rod. Use a rubber mallet to knock it on if
necessary.
Screw in the top sleeve a few turns in the cylinder tube.
Apply flange sealant FD 1042 on the threads.
Tighten using a hook spanner.
NOTE!
Long curing time.
Too early usage can cause leakage.
The curing time for the flange sealant is 4 hours. The cylinder must
not be used before this.
https://www.forkliftpdfmanuals.com/

Table of Contents

Related product manuals