EasyManua.ls Logo

BT REFLEX RR B2-3CC - 5- Preventive maintenance - P2; 5.1 Maintenance Schedule; 5.1.1 RR B;E 1-8

BT REFLEX RR B2-3CC
514 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Valid from serial number T-code
713962- 403-414, 669-671, 716-718
Order number Date
218920-040 2005-09-09
© BT Europe AB Service Manual REFLEX RR B,E RR B,E CC 5- 1
Preventive maintenance – P2
Maintenance Schedule
5- Preventive maintenance – P2
5.1 Maintenance Schedule
5.1.1 RR B/E 1-8
Table 4: Maintenance schedule RR B/E 1-8
Pos.
no.
Work to carry out
Interval in hours 5 20 250 500 1000 3000
Interval in days/weeks/months 1 d 1
wk
3 m 6 m 12 m 36 m
0000 Chassis
0000.1 Check for cracks or damage X
0340.1 Check door locking and lubricate door
hinges
A
0350.1 Lubricate the runners in the reach car-
riage
F
0390.1 Check the battery mounting and wear to
the battery lock.
U X
0390.2 Check the locking of the roller bed X
0510.1 Tighten hinges and guides on the cab A
0620.1 Check the mounting of the seat and
adjustment functions.
X
0640.1 Check the operation of the driver's con-
trols
U X
0640.2 Check the wheel function U X
0640.3 Check the brakes U X
0640.4 Check pedal function U X
0640.5 Check the horn U X
0810.1 Check the attachment of the machine
housing and the protective roof.
X
0820.1 Check the pinch guard X
0840.1 Check the emergency switch U X
https://www.forkliftpdfmanuals.com/

Table of Contents

Related product manuals