EasyManua.ls Logo

Daedong DSF75GT - Page 100

Daedong DSF75GT
224 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
-
7
DRIVING COMBINE HARVESTERDSF75
GT
6
-
6
6
-
7
DRIVING COMBINE HARVESTERDSF75
GT
6
-
6
5. Set and x the unloader to its sup-
port.
6. Confirm that the horn and head-
lamps are correctly operated.
7. Place the reaping and threshing
clutch levers in the OFF position
and the main shift lever in the OFF
position, and start the engine. Set
the engine speed over 2,000 RPM.
(The engine cannot be started un-
less the main shift lever is in the
"OFF" position.)
1
2
1
2
cf1O607a
(1) Grain Tank (2) Fixing Bolt
3. Fix the grain tank to the vehicle
body with the xing bolt.
4. Fit the lower cover to the grain
tank.
1
2
1
2
22
cf1O606a
8. Lift and fix the reaping unit with
the power steering lever.
9. To steer the vehicle, move the
power steering lever to the left or
right gently.
(1) Unloader (2) Support
CF100(DSF75GT)_콤바인_영문판_06.indd 6 2017-07-03 오후 2:27:09

Table of Contents

Related product manuals