EasyManua.ls Logo

Daedong DSF75GT - Reaping operation sequence

Daedong DSF75GT
224 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
-
5
HARVESTDS
F75GT
7
-
4
7
-
5
HARVESTDS
F75GT
7
-
4
7
REAPING OPERATION SEQUENCE
1. To stop the machine after entering
a field, place the main shift lever
in the OFF position and the range
shift lever in the Neutral position.
2. Operate the throttle lever to raise
the engine speed up to 2,000
RPM.
111
22
AA
cf1O703a
4. Operate the throttle lever to set
the needle on the tachometer at
2,000 RPM which is suitable for
eld operation.
1
A
1
A
cf1O704B
(1) Needle
(A) 2,000rpm
(1) Throttle Lever
(2) Threshing Clutch Lever
(A) Engage
When the threshing clutch
lever is in the Engage posi-
tion with the engine running at
2,000 RPM or higher, the drive
belt can be damaged.
IMPORTANT
Adjust the engine speed with the
threshing clutch lever set in the
Engage position and the vehicle
stopped.
NOTE
3. Set the threshing clutch lever in
the Engage position.
CF100(DSF75GT)_콤바인_영문판_07.indd 5 2017-07-03 오후 2:33:25

Table of Contents

Related product manuals