EasyManua.ls Logo

Daedong DSF75GT - Opening Grain Tank

Daedong DSF75GT
224 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
-
15
MAINTENANCED
SF75GT
8
-
14
8
-
15
MAINTENANCED
SF75GT
8
-
14
When installing the unloader auger
shaft assembly 1, its boss 4 part
marked as (bottom) should face down
and should be 90° behind the blade
direction of the tank auger.
d85O891A
(1) Unloader Auger Shaft Assembly 1
(2) Tank Auger Assembly (End)
INSTALLING TANK AUGER AS-
SEMBLY AND UNLOADER AUGER
SHAFT ASSEMBLY 1
3. Remove the tank side cover.
(1) Tank Side Cover
OPENING GRAIN TANK
1. If there are grains in the tank, empty the
tank according to the instructions speci-
ed in the section "Discharging grains."
2. Store and x the unloader to its sup-
port.
(1) Unloader (2) Unloader Support
Make sure to open the grain
tank only when it is empty.
Set the shift levers to the neu-
tral position and the reaping
and threshing clutch levers to
the "
Disengage" position.
CAUTION
1
22
1
CF1O803A
11
CF1O804A
Incorrect installation can re-
sult in interference and dam-
age of the auger and abnormal
operation of the tank auger.
CAUTION
CF100(DSF75GT)_콤바인_영문판_08.indd 14 2017-07-03 오후 2:37:22

Table of Contents

Related product manuals