EasyManua.ls Logo

Daedong DSF75GT - Cautions During Work; Preparation of each Part Be-Fore Work; Preparation of each Part before Work

Daedong DSF75GT
224 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
-
5
HARVESTDS
F75GT
7
-
4
7
-
5
HARVESTDS
F75GT
7
-
4
(1) Unloader
1. Store and fix the unloader to its
support.
2. Check that the tank drive belt is
tight and the tank mounting bolt is
tightened rmly.
PREPARATION OF EACH PART BEFORE WORK
INSPECTING TANK
11
cf1O701a
11
2
2
cf1O702a
(1) Tank Mounting Bolt
(2) Tank Driving Belt
CAUTIONS DURING WORK
1. Never operate the threshing clutch
lever while the engine is running
at a low speed. The threshing unit
can be clogged or damaged.
2. It is hard to work on a small eld
or on the edge of a eld. For your
safety, work with care at a low
speed.
3. When switching between the cutter
and dropper operations, stop the
threshing unit in advance.
4. When the dust-proof cover on the
engine gets dusty during work,
clean it as necessary. If keeping
working with the dusty dust-roof
cover, the engine can be overheat-
ed.
CF100(DSF75GT)_콤바인_영문판_07.indd 4 2017-07-03 오후 2:33:25

Table of Contents

Related product manuals