Replace O-ring in meter. Fig 16.24.
Figure 16.24: Meter o-ring
8
Install new valve in reverse order steps.
9
Ensure all tube connections are secure.
10
Open all valves.
11
Turn on power.
12
If applicable, connect an adapter to the nozzle and to other end of adapter tube/hose to the
fill up valve. Previous Fig 16.17.
13
Push the push to start button.
14
Check the site glass and make sure there are no air bubbles.
WM048523 Rev 08 01/2019 289