EasyManua.ls Logo

Epson C Series - Page 397

Epson C Series
668 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C8 Maintenance 9. Joint #5
C Series Maintenance Manual Rev.2 377
C8L,C8XL:
Install the Arm #4 extension flange to the Arm #4 extension part.
C8L:
Apply adhesive to the J4 sleeve and the J4 pulley bearing mating
part (indicated by a yellow mark in the right photo)
Adhesive: Loctite641
Hexagon socket head cap bolts: 4-M6×20
Tightening torque: 13.0 ± 0.6 N·m
4. Pass the cables to the Arm #4.
Connect all the
connectors inside the Arm #3 and bind them
together.
Fix the cables inside the Arm #4, and connect the D-sub to the Arm
#4.
For details, refer to Installation steps in C8 Maintenance 4.1 Cable
Unit.

Table of Contents

Related product manuals