Start-up
Requirements When commissioning the welding system, the following requirements must be
met:
-
All components are installed and connected as described in the "Installa-
tion" chapter
-
All appropriate welding media is connected
-
Feed rollers are inserted in wirefeeders or drive unit
-
Wire electrode is threaded in
-
Feed roller contact pressure is set
-
Motor adjustment completed
-
All covers closed, all side panels in place, all safety devices intact and in
their proper place (e.g. protective covers)
General The device is commissioned by means of an active welding start signal.
155
EN