EasyManua.ls Logo

Fujitsu AJ 126LELDH Series - Page 1078

Fujitsu AJ 126LELDH Series
1092 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation of Fresh air intake kit
1. Attach the Fresh air intake kit to the main body using the bolts provided.
Metal fittings
Bolt × 4
DRAIN
PIPE
DRAIN
PIPE
2. Attach the Hook plate by each corner of the Fresh air intake kit. (The attaching screws are at-
tached to the body of the Fresh air intake kit and must be loosened before installing.)
Screw
Hook plate
or
Attached
at UTZ-VXGA
Attached
at UTZ-VXRA
3. Install the cover.
a. Remover the drain cover attached to the decorative panel and install onto the Fresh air
intake kit.
Drain cover
b. Set the cover in position with screws (2 places) as shown below. Apply the Insulation 4
after installing the cover.
Screw × 4
Screw × 4
Insulation 4
Cover
5 to 10 mm
8-4. Fresh air intake kit for Circular flow cassette type and 4-way flow cassette type
- (10-48) - 8. Optional parts installation
OPTIONAL
PARTS
OPTIONAL
PARTS

Table of Contents

Related product manuals