EasyManua.ls Logo

HP 54620A - Page 158

HP 54620A
243 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
Build the second test connector using a BNC connector and a 1-by-2
section of Berg strip.
a
Solder two resistors to the Berg strip, in parallel across the two pins.
b
Solder the center of the BNC connector to the center pin of one row
on the Berg strip.
c
Solder the ground tab of the BNC connector to the center pin of the
other row on the Berg strip.
1-by-2 Connector Setup
Figure 53
Testing, Adjusting, and Troubleshooting the Analyzer
To make the test connectors
157

Table of Contents

Other manuals for HP 54620A

Related product manuals