EasyManua.ls Logo

Huawei RH8100 V3 - Page 126

Huawei RH8100 V3
386 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
You have installed all DIMMs on the memory board to be installed. For details, see
5.2.8 Installing a DIMM.
Data
You have obtained the cabinet number and chassis number of the RH8100 V3.
You have located the RH8100 V3 based on the preceding information, and
labeled its panel to prevent misoperations.
You have determined the position on the RH8100 V3 for installing a memory
board.
Tools
ESD gloves
Packaging materials, for example, an ESD bag
Hardware
Spare memory board
Procedure
Step 1 Wear an ESD wrist strap or ESD gloves. For details, see 1 Safety Instructions.
Step 2 Take the spare memory board out of the ESD bag, and install all DIMMs of the
required model on the memory board.
Step 3 Insert the memory board slowly into the slot on the compute module while
holding the ejector lever on the memory board. See step (1) in Figure 5-5.
Step 4 Lower the ejector lever on the memory board. See step (2) in Figure 5-5.
RH8100 V3 Server
User Guide 5 Removing and Installing Parts of the RH8100 V3
Issue 30 (2019-12-19) Copyright © Huawei Technologies Co., Ltd. 116

Table of Contents

Related product manuals