You have powered o the RH8100 V3. For details, see 6.2 Powering O the
RH8100 V3. Then you have removed all power cables from the server.
You have installed the RAID controller card on the front I/O module. For
details, see 5.6.6 Installing a RAID Controller Card.
You have installed the supercapacitor on the front I/O module. For details, see
5.6.8 Installing a Supercapacitor.
You have installed the hard disk indicator panel on the front I/O module. For
details, see 5.6.10 Installing a Hard Disk Indicator Panel.
You have installed the hard disk backplane on the front I/O module. For
details, see 5.6.12 Installing a Hard Disk Backplane.
Data
You have obtained the cabinet number and chassis number of the RH8100 V3.
You have located the RH8100 V3 based on the preceding information, and
labeled its panel to prevent misoperations.
You have determined the position on the RH8100 V3 for installing a front I/O
module.
Tools
ESD gloves
Packaging materials, for example, an ESD bag
Procedure
Step 1 Wear an ESD wrist strap or ESD gloves. For details, see 1 Safety Instructions.
Step 2 Take out the front I/O module from the ESD bag and install the internal
components, such as the RAID controller card, supercapacitor, hard disk indicator
panel, and hard disk backplane.
Step 3 Hold the ejector levers of the front I/O module and push the module steadily into
the cabinet. See step (1) in Figure 5-64.
Step 4 Lower the ejector levers on both sides of the front I/O module. See step (2) in
Figure 5-64.
RH8100 V3 Server
User Guide 5 Removing and Installing Parts of the RH8100 V3
Issue 30 (2019-12-19) Copyright © Huawei Technologies Co., Ltd. 181