EasyManua.ls Logo

Husky Altanium Neo2 - Input Wiring (Conventional); Environmental Specification; Controller Lifting Instructions

Husky Altanium Neo2
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Input Wiring (Conventional) 5
User Guide v 1.4 — September 2015 Introduction
1.5 Input Wiring (Conventional)
The following table summarizes the wiring conventions used.
1.6 Environmental Specification
Operating Temperature: 0-40 °C (32-104 °F)
Operating Humidity: 0%-95% RH, Non-Condensing
1.7 Controller Lifting Instructions
Use the follow steps when lifting the Altanium controller. The lifting device (crane or forklift)
and straps that are used vary in lifting ability and lengths, depending on whether the
Altanium is a single, double, or triple stack controller. See the table that follows for the correct
lifting ability and lengths.
Description Wire Color
Neutral Blue
Earth/Ground Green Green/Yellow
Line Black Black
Line Brown Red
Line Gray White
DANGER!
Electrocution and/or mechanical hazard - risk of death or serious injury and possible
damage to the equipment.
Incorrectly wiring the controller could cause death or serious injury and/or damage to
the controller or hot runner. Only qualified personnel should connect the electrical
power supply. All work must conform to applicable local electrical codes.

Table of Contents

Related product manuals