EasyManua.ls Logo

KEEWAY 500ATV - Page 121

KEEWAY 500ATV
218 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6. Engine Removal;In
spection & Installation
6-59
2.
Seal to divide evenly all coated in the right box processing surfaceAt about 0.3 mm
thickne
ss.
3.All of the flange bolts lock first diagonal tighten, which in turn lock.
4.
Close box lock bolts crankshaft, exam
ined the output shaft, and shift drum of the drive
shaft rotation is flexible.
1
2
3
4
5As shown in figure respectively with
6 his hands on the part about before and
7after, pressure or so housing.
With the right to knock tongbang ends
about closed box
6

Table of Contents