EasyManua.ls Logo

KEEWAY 500ATV - Page 27

KEEWAY 500ATV
218 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. V
ehicle bodyMuffler
2-9
Re
move connector of meter
Remove connector of headlight
Remove front cover assembly.
Installation
Reverse the rem
oval procedure of installation.
F
RONT COVER ASSEMBLY
DISASSEMBLY /INSTALLATION
1.
METER ASSEMBL
Y
2.
WA
SH ER (
φ
5)
3.
NUT
, FLANGEM5
4.
COVE
R, WATER TANK
5.
SCREW
(M6×16)
6.
NUT
,CLIPM6
7.
WA
SH ER RUBBER
8.
BA
TTERY COVER
9.
EXP
ANSION SCREW(M8×20)
10.
COVER,
LEFT LINE.FR
11.
COVER,
RIGHT LINE.FR
12.
FRONT
COVER(L)
13.
FRONT
COVER(R)
14.
SCREW
(M6×16)
15.
COVE
RRADIATOR
16.
COVER,
VENT GRILLE
17.
HEADL
IGHT UNIT,L
18.
HEADL
IGHT UNIT,R
19.
WA
SH ER(
φ
φ
15×1)
20.
SCREW(M5×10)
21. HEADL
IGHT.L. FENDER
22. HEADLIGHT.R. FENDER
23. SCREW,TAPST4.2×16
24. HORN
2

Table of Contents