EasyManua.ls Logo

Manitowoc Grove GMK6300L - Rigging Work Checklists for Crane Operation with the Main Boom; CHECKLIST: Rigging; Rigging Work

Manitowoc Grove GMK6300L
1004 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating Manual GMK6300L 3 112 xxx en 12 - 1
xx.xx.xxxx
12 Rigging work
If the truck crane on the site has already been rigged, proceed according to
the
CHECKLIST: Checks before operating the crane, p. 11 - 1.
12.1 Rigging work checklists for crane operation with the
main boom
H
This checklist is not a complete operating manual. There are accompanying
instructions, which are indicated by cross-references.
Observe the warnings and safety instructions there!
12.1.1 CHECKLIST: Rigging
1. Choose a suitable site; à Choice of a suitable positioning site, p. 12 - 9.
2. Check that the parking brake is applied – if necessary, apply the parking
brake.
3. If the main boom is resting on a trailer:
Switch off the boom floating position;
à p. 12 - 17,
Switch off the slewing gear freewheel;
à p. 12 - 18,
If necessary, switch off boom pre-tensioning;
à p. 12 - 19.
s

Table of Contents

Other manuals for Manitowoc Grove GMK6300L

Related product manuals