Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating Manual GMK6300L 3 112 xxx en 12 - 1
xx.xx.xxxx
12 Rigging work
If the truck crane on the site has already been rigged, proceed according to 
the 
CHECKLIST: Checks before operating the crane, p. 11 - 1.
 12.1             Rigging work checklists for crane operation with the 
main boom
H
This checklist is not a complete operating manual. There are accompanying 
instructions, which are indicated by cross-references. 
Observe the warnings and safety instructions there! 
 12.1.1             CHECKLIST: Rigging
1. Choose a suitable site; à Choice of a suitable positioning site, p. 12 - 9.
2. Check that the parking brake is applied – if necessary, apply the parking 
brake. 
3. If the main boom is resting on a trailer:
– Switch off the boom floating position; 
à p. 12 - 17,
– Switch off the slewing gear freewheel; 
à p. 12 - 18,
– If necessary, switch off boom pre-tensioning; 
à p. 12 - 19. 