EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK6300L

Manitowoc Grove GMK6300L User Manual

Manitowoc Grove GMK6300L
1004 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #870 background imageLoading...
Page #870 background image
Rigging work
12.8 Rigging work on the main boom
12 - 112 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
12.8.8 Anemometer and air traffic control light
Installing The anemometer and the air traffic control light – if provided – are located
on the same rod.
• If necessary, remove the rod from the
storage compartment (1).
• Insert the rod (1) into the holder (3) and
secure it with the retaining pins.
• Remove the cable from the holders (2) and
connect
– the anemometer to socket (4),
– the air traffic control light to the socket (5).
• Lay the cables in such a way that they will
not be damaged during crane operation.
• Check that the anemometer is able to swing
so that it hangs vertically even when the
main boom is raised.
S
Risk of damage during on-road driving!
Always remove the anemometer and air traffic control light before on-road
driving.
This prevents the specified overall height being exceeded at on-road level,
and the anemometer from getting damaged due to unfavourable air
currents.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L and is the answer not in the manual?

Manitowoc Grove GMK6300L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals