Rigging work
12.1 Rigging work checklists for crane operation with the main boom
12 - 6 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
 12.1.2             CHECKLIST: Unrigging 
H
This checklist is not a complete operating manual. There are accompanying 
instructions, which are indicated by cross-references. 
Observe the warnings and safety instructions there!
1. If the truck crane is in the 
free on wheels working position:
Support the truck crane with the outrigger span required for the job 
according to the 
Lifting capacity table and raise until none of the wheels 
touches the ground; 
à Outriggers, p. 12 - 27.
2. With the RCL set correspondingly, unrig the counterweight; 
à CHECKLIST: Unrigging the counterweight, p. 12 - 60.
3. If required, remove the auxiliary hoist; 
à CHECKLIST: Auxiliary hoist, 
removing
, p. 6 - 91.
4. Enter the current rigging mode with the newly rigged counterweight 
combination on the RCL; 
à p. 11 - 23.
5. Retract the main boom, lock the telescopic sections and lock the tele-
scoping cylinder to telescopic section 
I for on-road driving; à Locking 
the telescopic section for on-road driving
, p. 11 - 88.