EasyManua.ls Logo

Manitowoc Grove GMK6300L - Page 763

Manitowoc Grove GMK6300L
1004 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating Manual GMK6300L 3 112 xxx en 12 - 5
xx.xx.xxxx
21. If required, assemble the auxiliary hoist; à CHECKLIST: Auxiliary
hoist, installing
, p. 6 - 89.
22. With the RCL adjusted accordingly, rig the counterweight combination
required for the operation according to
Lifting capacity table;
à CHECKLIST: Rigging the counterweight, p. 12 - 58.
23. Enter the current rigging mode with the newly rigged counterweight
combination on the RCL;
à p. 11 - 23.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L

Related product manuals