Driving
5.1 Before driving
Operating Manual GMK6300L 3 112 xxx en 5 - 1
xx.xx.xxxx
5 Driving
 5.1             Before driving
 5.1.1             CHECKLIST: Checks before on-road driving
H
This checklist is not a complete operating manual. There are accompanying 
instructions, which are indicated by cross-references. 
Observe the warnings and safety instructions there!
1. If the boom is on the boom rest 
– All telescopic sections are interlocked; the telescoping cylinder is 
locked with telescopic section 
I.
– The slewing gear must be switched off; 
à p. 11 - 100.
– The turntable is also locked; 
à p. 11 - 14.
– The swing-away lattice must be in the rigging position;
à Operating Instructions Lattice Extension
– The symbol (1) is displayed (if present); à p. 5 - 9.
2. When the main boom is resting on a trailer
– All telescopic sections must be locked together.
– The slewing gear must be switched off; 
à p. 11 - 100.
– The boom floating position is switched on; 
à p. 6 - 13.
– The slewing gear freewheel is switched on; 
à p. 6 - 12.
– The boom pre-tensioning may be switched on; 
à p. 6 - 14.
– The houselock may be switched off; 
à p. 11 - 15.
– The turntable has been unlocked; 
à p. 11 - 14.
s