Malfunctions during crane operation
14.6 Hydraulic emergency operation
Operating Manual GMK6300L 3 112 xxx en 14 - 75
xx.xx.xxxx
 14.6.6             After emergency operation
You must restore the truck crane to its original state after finishing emer-
gency operation.
Switching off 
emergency 
operation
• Switch off the engine.
Switching over to 
crane operation
After every emergency operation
• Switch valves 1 to 5 to crane operation; à p. 14 - 69.
Also after lifting/lowering
• Switch off continuous operation at the valves Y1105 and Y1104; 
à p. 14 - 71.
Also after slewing
• Open the valve 6; à p. 14 - 72.
Disconnecting 
the hoses
• Disconnect the hoses; à p. 14 - 67. 
• Close all the connections and hoses with the caps.
• Remove the transformer.