Malfunctions during crane operation
14.6 Hydraulic emergency operation
Operating Manual GMK6300L 3 112 xxx en 14 - 71
xx.xx.xxxx
For lifting/
lowering
After establishing hydraulic circuits, switch one additional valve to
continuous operation.
Switching on continuous operation
Always switch only one valve to continuous
operation.
• Unscrew the cap (3), e.g. from the valve (1).
• Remove the plug (5).
• Screw the cap and pin (4) on to the valve –
continuous operation is now switched on.
Switching off continuous operation
• Remove the cap (3) from the actuated
valve (1), (2).
• Screw the cap on so that the pin (4) can be
seen.
• Insert the plug (5).
s
1 Valve Y1104 – Lowering or
2 Valve Y1105 –
Lifting
S
Danger due to falling loads!
Switch off continuous operation immediately after the emergency activa-
tion.
Check whether the pins can be seen on both caps.
In this way, you can prevent loads falling immediately after being lifted
during subsequent crane operations.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L and is the answer not in the manual?

Manitowoc Grove GMK6300L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals