Rigging work
12.1 Rigging work checklists for crane operation with the main boom
12 - 4 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
15. Switch off the houselock, if necessary; Ã Switching off the houselock,
p. 11 - 17.
16. Pick up the hook block and reeve the hoist rope again, if necessary;
à Hook block on a separate vehicle, p. 12 - 87,
à Hook block on the bumper, p. 12 - 85,
à Reeving and unreeving the hoist rope, p. 12 - 92.
17. Install the lifting limit switch;
à p. 12 - 106.
18. Install the anemometer and air traffic control light;
à p. 12 - 112.
19. Perform all the required checks prior to crane operation;
à CHECKLIST: Checks before operating the crane, p. 11 - 1.
20. Enter the current rigging mode on the RCL;
à p. 11 - 23.