Rigging work
12.8 Rigging work on the main boom
Operating Manual GMK6300L 3 112 xxx en 12 - 91
xx.xx.xxxx
Rigging for crane
operation
• Slacken the hoist rope and derrick the main
boom simultaneously.
• Raise the main boom until the boom head
is in a vertical position above the block
hook (1).
• Detach the block hook from the retaining
ropes (2).
• (A) – Pull the pin (3) out.
• (B) – Raise the hook block (1) above the
hook (2 until the connecting points are
aligned.
• Insert the pins (3) and secure them with the
retaining pins.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L and is the answer not in the manual?

Manitowoc Grove GMK6300L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals