EasyManua.ls Logo

Mindray A7 - AGSS Transfer Tube Maintenance; Electrical Safety Inspection

Mindray A7
312 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A7™ Operating Instructions 046-004667-00 7 - 7
Maintenance AGSS Transfer Tube Maintenance
7.7 AGSS Transfer Tube Maintenance
Check the tube of the AGSS transfer system. Replace it if it is damaged.
7.8 Electrical Safety Inspection
Refer to the Service Manual for the details.
NOTE: Perform electrical safety inspection after servicing or routine
maintenance. Before the electrical safety inspection, make sure all the
covers, panels, and screws are correctly installed.
NOTE: Perform the electrical safety inspection once a year.

Table of Contents

Other manuals for Mindray A7

Related product manuals