Regular Maintenance Maintenance
7 - 26 046-004667-00 A7™ Operating Instructions
FIGURE 7-26 Removal of AGSS Top / AGSS Filter Inspection
5. Reassemble the AGSS and Transfer Hose and reconnect them to the A7 in the reverse order.
7.10 Regular Maintenance
WARNING: To avoid endangering a patient, do not perform testing or maintenance
when the machine is in use.
Visual inspection should be performed every 30 days to ensure timely replacement of worn or
damaged parts.
1. Power off the system.
2. Perform an overall visual inspection of the system.
3. Power up the system and follow the on-screen prompts to perform the leak test and the
compliance test (see section 4.5 (page 4-8) "Leak and Compliance Tests").
AGSS Filter