EasyManuals Logo

Mindray A9 Service Manual

Mindray A9
424 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #332 background imageLoading...
Page #332 background image
8-32
8.35 Disassemble the Module Rack Assembly
8.35.1 Prepare for Disassembly
8.35.1.1 Tools
During parts disassembly and replacement, the following tools may be required:
Phillips screwdriver
8.35.1.2 Preparations
Before disassembly,
Make sure that the anesthesia machine is turned off and disconnected from the A/C power
source.
Maneuver the anesthesia machine to an appropriate location and then apply the brake.
8.35.2 Remove the Module Rack Assembly
1. Remove the four screws from the module rack assembly with the Phillips screwdriver.
2. Gently pull out the module rack assembly, disconnect the cables (marked by □ in the figure),
and remove the assembly.
Two screws on the
rear of the cart
Two screws inside the
drawer mounting position
AGSS assembly

Table of Contents

Other manuals for Mindray A9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mindray A9 and is the answer not in the manual?

Mindray A9 Specifications

General IconGeneral
TypeAnesthesia Workstation
Integrated Gas AnalysisYes
Backup BatteryYes
Operating Temperature10°C to 40°C
Storage Temperature-20°C to 55°C
Battery TypeLithium-ion
Ventilation ModesVolume Control, Pressure Control, SIMV, Manual Ventilation
DisplayTouchscreen
Patient MonitoringECG, SpO2, NIBP, EtCO2, Temperature
ConnectivityEthernet, USB
PortabilityMobile (with wheels)
Battery LifeMinimum 90 minutes (typical)
AltitudeUp to 3000 meters
Power Supply100-240 VAC, 50/60 Hz
Charging TimeApproximately 4 hours
StorageInternal storage for patient data and system logs
Supported LanguagesMultiple languages
CertificationsCE, FDA

Related product manuals