EasyManuals Logo

Mindray BS-130 User Manual

Mindray BS-130
267 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #166 background imageLoading...
Page #166 background image
7 Service and Maitenance 7-39
7
Select Purge Combination from the Instructions list, and enter
digit “25” in the edit boxes to the right of Purge A and Purge B.
Select Execute to start the purge cycle based on the parameters
you have entered.
8 Select Maintenance Cycle from the Instructions list and select
Execute.
9 Place the Power to OFF.
10 Remove the electrodes.
11 Seal the hole on the reference electrode with “insert” shown in the
following figure.
Red sphere
Insert
12 Aspirate a small amount of Calibrant A from the port of the reagent
module with a syringe and inject it into the lumens of the K+
electrode(and Li+ electrode) until the lumens are full.
Cover both ends of the lumens with tapes to prevent the Calibrant
A flowing from the lumens.
Put the K+ electrode and Li+ electrode into their individual sealed
bags.
13 Remove the reagent pack.
14 The tube adapters on Reagent Pack should be covered by the red
caps. Store the Reagent Pack properly.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mindray BS-130 and is the answer not in the manual?

Mindray BS-130 Specifications

General IconGeneral
BrandMindray
ModelBS-130
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals