7-38 7 Service and Maitenance
8 Execute Purge A Cycle. If no error occurs during the
process, it means the electrode is replaced successfully.
9 Place the ISE door to its orginal place.
7.7.3 Replacing Tubing
Replace the tubing with specified one after long time use, if necessary.
7.7.4 Storage of ISE Module (Optional)
BIOHAZARD
Wear gloves and lab coat and, if necessary, goggles.
Dispose of the waste part in accordance with your local or national
guidelines for biohazard waste disposal.
CAUTION
The maintenance is necessary to be performed when the ISE unit
(optional) is connected.
When ISE module electrodes are installed, the power of ISE module
should always be turned on. If the power has been turned off for
more than 0.5 hour, please follow the instructions to store
electrodes。
Please use Mindray-recommended consumables. Other
consumables may decrease the system performance.
1 Enter the ISE screen of the Maintenance of the system software.
2 Select Clean Cycle from the Instructions list and select Execute.
3 After exiting the system software, place the Power to OFF.
4 Pull out the joint A and joint B of the wand tubing which has been
inserted into the adapters of the pump tubing. Hold them on for a
few seconds until the solution in the wand tubing flows back to
Reagent Pack.
5
Install the back panel of the analyzing unit and connect the power
cable, serial port calble.
6
Place the Power to ON.