Forced dynamisation:
When monitoring sensors with square output signals (TTL, HTL) or safe sensors, the axis
must be moved within 8 hours so that the signal changes on all the connected tracks.
If forced dynamisation of the signals cannot be carried out every 8 hours, then the average
frequency of a dangerous failure (PFH) is increased.
If the forced dynamisation time is increased, the stated PFH value must be multiplied by the
following correction factors:
Forced dynamisation within 4 weeks → Correction factor 1.01
Forced dynamisation within 8 weeks → Correction factor 1.02
Explanation:
SRP/CS = Safety-related part of a control system (EN 13849-1, Tab. 2)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Pilz PNOZ s30 and is the answer not in the manual?

Pilz PNOZ s30 Specifications

General IconGeneral
BrandPilz
ModelPNOZ s30
CategoryRelays
LanguageEnglish

Related product manuals