6. Use a 1/2” wrench to loosen the drive belt idler pulley nut to remove all tension from
the input drive belt.
7. Remove the pillow block bearings, see "Pillow Block Bearing Replacement" on
page155. Retain part(s) and/or fastener(s) for installation.
8. Slide the input drive assembly through the step-up and drive belts and remove.
Contact Precor Customer Support at support@precor.com or 800.786.8404 with
any questions.
Page 119
6 Available Replacement Procedures
Input Drive Belt and Step-up Belt Replacement