EasyManuals Logo

QubicaAMF XLi EDGE Series User Manual

QubicaAMF XLi EDGE Series
260 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #121 background imageLoading...
Page #121 background image
QubicaAMF XLi EDGE Pinspotter
Section 4.4 Page 4.4-86 Rev. Date: 10/2016
4.4.2 Preventive Maintenance Schedule
Pinspotter
Daily
Check the call sheets for the previous day, transfer calls to stop summary
Investigate / correct machines that have developed a malfunction
pattern.
Clean Positive Ball Lift (PBL) Belt with a dry rag
Clean Distributor Belt with a dry rag
Assign and record completed PM on the PM charts
Weekly
Inspect the Carrier Rails for correct installation direction (pointed end
down)
Inspect Kickout Springs (2 per machine) missing, bent, or loose
Remove, launder, and install Ball Wipes and Dust Collector Cloths
Inspect Distributor, observe for proper operation, correct as needed
Clean Durabin and Shuttle with a vinyl type dressing
Clean O-Pan and Distributor Funnels with a vinyl type dressing
XLi

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the QubicaAMF XLi EDGE Series and is the answer not in the manual?

QubicaAMF XLi EDGE Series Specifications

General IconGeneral
BrandQubicaAMF
ModelXLi EDGE Series
CategoryAccessories
LanguageEnglish