Operating Instructions Cubis
®
MCE 77
Decommissioning
11 Decommissioning
11.1 Decommissioning the Device
Procedure
t Turn the device off.
t Disconnect the device from the power supply.
t Disconnect the device from all connected devices and all accessories,
e.g. printeror electronics module.
t Device with an analytical draft shield or flat glass draft shield: Remove
the draft shield side panels and upper panel (see Chapter “9.2 Preparing
a Device with a Frame Draft Shield”, page 70).
t Clean the device (see Chapter “9.3 Cleaning the Device”, page 70).
t Re-insert all components into the device (see Chapter “5.6 Installing a
Device with an Analytical Draft Shield or Flat Glass Draft Shield”,
page 35, Chapter “5.7 Installing a Device with a Frame Draft Shield”,
page 38).
t If below-balance weighing has been set up:
t Turn the device on its side and place it on a soft support base.
t Remove the hook for below-balance weighing from the thread.
t Insert the hook for below-balance weighing (2) into its retainer on the
underside of the weighing module.
t Re-insert the cover of the below-balance weighing equipment (1).
t Place the device on the device base on a level surface.
12 Transport
12.1 Transporting the Device
Procedure
t
CAUTION Risk of injury from breaking glass! Glass components can
break if they fall or are handled incorrectly. Glass fragments can cause
cuts.
t Only lift the device by its base, not by the draft shield.
t When lifting and transporting, ensure that no personnel or objects
are in the way.
t Get help from additional persons when lifting and transporting the
device.
t Use suitable conveyance devices, e.g., trolleys, for long transport routes.
21