6HWSRLQW
S
S
Q
Figure5-9 Minimum and maximum motor speed
Q
6HWSRLQW
S
S
W
Q
PD[
S
Figure5-10 Ramp-up and ramp-down time of the motor
Ramp-down time for the OFF3 command
Motor data identi󹪝cation: Select the method which the converter uses to measure the data of
the connected motor:
: Motor data is not measured.
: Recommended setting: Measure the motor data at standstill and with the
motor rotating. The converter switches o󹪜 the motor after the motor data identi󹪝cation has
been completed.
: Measure the motor data at standstill. The converter switches o󹪜 the motor after the
motor data identi󹪝cation has been completed.
Select this setting if one of the following cases is applicable:
You have selected control mode ; however, the motor cannot rotate freely.
You have selected U/f control as control mode, e.g. or
: Measure the motor data while the motor is rotating. The converter switches o󹪜 the
motor after the motor data identi󹪝cation has been completed.
: Setting the same as
After the motor data identi󹪝cation, the motor accelerates to the current setpoint.
: Setting the same as
After the motor data identi󹪝cation, the motor accelerates to the current setpoint.
Complete the data entry for quick commissioning as follows:
1. Switch over the display using an arrow key: →
2. Press the OK key.
You have entered all of the data that is necessary for the quick commissioning of the
converter.
Commissioning
5.4Quick commissioning using the BOP-2 operator panel
SINAMICS G120C Converters
136 Operating Instructions, 02/2023, FW V4.7 SP14, A5E34263257B AK